Aerospace

Airbus is winning orders more than twice as fast as it is winning deliveries

Commercial aircraft delivered and gross orders booked, 1 January to 31 July 2026.

← Back to Narrowbody Deliveries: Can the Duopoly Build What It Sold?

About this data

Through July, Airbus had delivered 418 aircraft to Boeing’s 367 — a gap of 51, or 14%. On gross orders the gap is 1,090 to 483, a factor of 2.3. The delivery gap is a manufacturing story and the order gap is a commercial one, and they are not the same story. Boeing’s delivery performance has substantially closed against Airbus since the 737 cap was lifted; its order performance has not. Note the reconciliation that makes the Boeing figure trustworthy despite coming from a trade compilation: 143 delivered in Q1 plus 171 in Q2 plus 53 in July is exactly 367, matching Boeing’s own quarterly releases.

Airbus is winning orders more than twice as fast as it is winning deliveries

Airbus is winning orders more than twice as fast as it is winning deliveries

Commercial aircraft delivered and gross orders booked, 1 January to 31 July 2026.

View data & sources →

Data table

Airbus is winning orders more than twice as fast as it is winning deliveries — ytd_scorecard data table (Narrowbody Deliveries: Can the Duopoly Build What It Sold?)
oem series deliveries source_ref value_basis gross_orders
Airbus ytd_scorecard 418 airbus-od-jul26 Airbus Orders & Deliveries page, YTD July 2026: 418 aircraft to 82 customers; YTD gross orders 1,090 per the July trade compilation 1090
Boeing ytd_scorecard 367 fi-jul-2026 YTD July 2026; reconciles exactly against Boeing’s own quarterly releases (143 Q1 + 171 Q2 + 53 July = 367) 483

Methodology & sources

Last updated: Aug 14, 2026

Methodology

This index answers one question: the single-aisle duopoly has sold roughly a decade of production it has not built — can it build it? Every chart isolates one input to that answer: how deep the queue is, which way it is moving, what rates have been announced against it, what is actually coming off the lines, and whether the engine makers are keeping up. SCOPE. Single-aisle programmes only: A320neo family, A220, 737 MAX and the residual 737 NG book. Twin-aisle figures appear only where they are needed as a denominator (the June output-mix chart). BASIS — BACKLOG COMPARISON. The June source reports the Boeing 737 backlog as one combined line (4,888); the July source splits it into MAX (4,817) and NG (34). The July value in the month-on-month chart is the sum, 4,851, so both months sit on the same basis. That addition is stated in the value_basis of the point. It is arithmetic on two published figures, not an estimate. CAVEAT — TARGETS ARE NOT RATES. Every value in the rate-target chart is a stated management target with a future date, not an approved or achieved rate. Airbus has announced 70-75 A320-family aircraft a month by end-2027 and 13 A220s a month in 2028. Boeing has named 52 a month as the step beyond the 47 it began transitioning to in Q2 2026, with NO published FAA approval and no timetable. For scale, the 2025 realised monthly averages were 50.6 (A320 family), 37.3 (737) and 7.8 (A220). No single-aisle programme at either company has ever run at its own stated target rate. CAVEAT — ENGINES, ONE FAMILY ONLY. GE Aerospace publishes LEAP delivery GROWTH percentages and does not publish absolute LEAP unit counts, so the engine chart is in percent and the base is unknown. Pratt & Whitney GTF delivery counts, which cover the other half of the A320neo book, were sought and not found in a citable primary release; they are OMITTED rather than estimated. Read that chart as evidence about one engine family, not about total narrowbody engine supply. CAVEAT — ONE MONTH IS NOT A TREND. The June-to-July backlog movement and the June output-mix split are single-month observations. July is an order-announcement-heavy month in this industry. They are shown because they are cleanly sourced and directional, not because one month establishes a rate. SOURCE TIERS. Company primary disclosure (Airbus, Boeing, GE Aerospace) is used wherever the figure exists there. Monthly backlog splits are not published in that form by either OEM and come from a trade compilation; the Boeing year-to-date figure from that compilation reconciles exactly against Boeing’s own quarterly releases (143 + 171 + 53 = 367), which is the corroboration standard applied. SUPERSEDES. This index absorbs and extends the three H1-2026 sections of /data/airbus-vs-boeing, which remains live so no URL is lost. Compiled and verified 2026-08-14. Working sheet with every source passage: Topics_Content/data/batch-6_aerospace_2026-08-14.md

Comparisons are informative, not definitive. See each source for definitions and limits.

How relevant was this information?