Narrowbody Deliveries: Can the Duopoly Build What It Sold?

Single-aisle backlog, announced production rates, output mix and engine throughput — the capacity question behind 13,000 unbuilt A320s and 737s.

Curated snapshot Last updated: Aug 14, 2026 18 data points
The single-aisle duopoly has sold a decade of production it has not built

The single-aisle duopoly has sold a decade of production it has not built

Unfilled single-aisle orders at 31 July 2026, aircraft. Airbus total backlog 9,352; Boeing 6,784.

View data & sources →
In one month Airbus’s queue grew and Boeing’s shrank

In one month Airbus’s queue grew and Boeing’s shrank

Single-aisle backlog at end-June against end-July 2026, aircraft. Boeing figure combines MAX and NG on both dates.

View data & sources →
Both OEMs are promising rates neither has ever achieved

Both OEMs are promising rates neither has ever achieved

Announced end-state monthly production rate by single-aisle programme. All three are stated targets, not approved or achieved rates.

View data & sources →
Airbus is winning orders more than twice as fast as it is winning deliveries

Airbus is winning orders more than twice as fast as it is winning deliveries

Commercial aircraft delivered and gross orders booked, 1 January to 31 July 2026.

View data & sources →
Airbus is a narrowbody company; Boeing is not

Airbus is a narrowbody company; Boeing is not

June 2026 deliveries split by body type, aircraft.

View data & sources →
The engine makers are ramping faster than the airframers

The engine makers are ramping faster than the airframers

GE Aerospace growth rates, 2026. LEAP powers every 737 MAX and roughly half of A320neo deliveries. Percentages, not unit counts — GE does not publish absolute LEAP deliveries.

View data & sources →

Data table

Narrowbody Deliveries: Can the Duopoly Build What It Sold? — full data table
series aircraft programme source_ref value_basis jul_2026 jun_2026 rate_per_month oem deliveries gross_orders widebody narrowbody pct metric
sa_backlog 7574 A320neo family fi-jul-2026 Airbus backlog table, end of July 2026
sa_backlog 4817 737 MAX fi-jul-2026 Boeing backlog table, end of July 2026
sa_backlog 574 A220 fi-jul-2026 Airbus backlog table, end of July 2026
sa_backlog 34 737 NG fi-jul-2026 Boeing backlog table, end of July 2026 — residual NG orders
backlog_shift A320neo family fi-jun-2026 End-of-June backlog table (7,461) against end-of-July table (7,574) in the companion report 7574 7461

13 more rows + CSV download

The full 18-row dataset, one-click CSV export, and the AI-ready context file are free with an account. Prefer to verify it yourself? The full methodology and sources are published below.

Methodology & sources

Last updated: Aug 14, 2026

Methodology

This index answers one question: the single-aisle duopoly has sold roughly a decade of production it has not built — can it build it? Every chart isolates one input to that answer: how deep the queue is, which way it is moving, what rates have been announced against it, what is actually coming off the lines, and whether the engine makers are keeping up. SCOPE. Single-aisle programmes only: A320neo family, A220, 737 MAX and the residual 737 NG book. Twin-aisle figures appear only where they are needed as a denominator (the June output-mix chart). BASIS — BACKLOG COMPARISON. The June source reports the Boeing 737 backlog as one combined line (4,888); the July source splits it into MAX (4,817) and NG (34). The July value in the month-on-month chart is the sum, 4,851, so both months sit on the same basis. That addition is stated in the value_basis of the point. It is arithmetic on two published figures, not an estimate. CAVEAT — TARGETS ARE NOT RATES. Every value in the rate-target chart is a stated management target with a future date, not an approved or achieved rate. Airbus has announced 70-75 A320-family aircraft a month by end-2027 and 13 A220s a month in 2028. Boeing has named 52 a month as the step beyond the 47 it began transitioning to in Q2 2026, with NO published FAA approval and no timetable. For scale, the 2025 realised monthly averages were 50.6 (A320 family), 37.3 (737) and 7.8 (A220). No single-aisle programme at either company has ever run at its own stated target rate. CAVEAT — ENGINES, ONE FAMILY ONLY. GE Aerospace publishes LEAP delivery GROWTH percentages and does not publish absolute LEAP unit counts, so the engine chart is in percent and the base is unknown. Pratt & Whitney GTF delivery counts, which cover the other half of the A320neo book, were sought and not found in a citable primary release; they are OMITTED rather than estimated. Read that chart as evidence about one engine family, not about total narrowbody engine supply. CAVEAT — ONE MONTH IS NOT A TREND. The June-to-July backlog movement and the June output-mix split are single-month observations. July is an order-announcement-heavy month in this industry. They are shown because they are cleanly sourced and directional, not because one month establishes a rate. SOURCE TIERS. Company primary disclosure (Airbus, Boeing, GE Aerospace) is used wherever the figure exists there. Monthly backlog splits are not published in that form by either OEM and come from a trade compilation; the Boeing year-to-date figure from that compilation reconciles exactly against Boeing’s own quarterly releases (143 + 171 + 53 = 367), which is the corroboration standard applied. SUPERSEDES. This index absorbs and extends the three H1-2026 sections of /data/airbus-vs-boeing, which remains live so no URL is lost. Compiled and verified 2026-08-14. Working sheet with every source passage: Topics_Content/data/batch-6_aerospace_2026-08-14.md