| Dimension | Series | Value | Value basis | Source |
|---|---|---|---|---|
| Total under construction | GW | 78 | Actual | IEA: Global Energy Review 2026: Nuclear |
| 2025 construction starts | GW | 12.2 | Actual | IEA: Global Energy Review 2026: Nuclear |
Data table
Download CSV| Gw | Series | Measure | Source | Value basis |
|---|---|---|---|---|
| 78 | under_construction | Total under construction | IEA: Global Energy Review 2026: Nuclear | Actual |
| 12.2 | under_construction | 2025 construction starts | IEA: Global Energy Review 2026: Nuclear | Actual |
How this evidence was built
What it measures
Counts capacity where construction has formally started: first structural concrete poured, not announcements, letters of intent, site options or memoranda. That distinction is the entire point of this index: SMR press activity is enormous and SMR construction is almost nil.
Key context
- Just two commercial SMRs are under construction anywhere: 125 MW in China and 300 MW in Russia.
- Note the unit change, the SMR chart is in megawatts while the capacity chart is in gigawatts, because plotting them on one axis would render the SMR bars invisible.
- Combined, those two projects are 0.425 GW against 78 GW total under construction.
- Context: half of all capacity under construction is in China, which expects ~100 GW installed by around 2030.
- Egypt, India and Türkiye each have roughly 5 GW under way.
Key numbers
- 78 GW under construction across 15 countries (iea-ger-2026-nuclear).
- Ten construction starts totalling 12.2 GW in 2025; nine in China, one in Russia (iaea-ntr-2025).
- Only two commercial SMRs under construction worldwide: 125 MW in China, 300 MW in Russia (iaea-ntr-2025).
- Iaea projects SMRs at 24% of new capacity by 2050 in its high case, 5% in its low case (iaea-projections).
Caveats
Caveat: the iaea projects SMRs at 24% of new capacity by 2050 in its high case and 5% in its low case. That is an unusually wide spread and reflects how little has actually been built, not disagreement about demand. Those projections are not seeded here: they are scenario outputs, not measurements.
Do not use this to
- Completion dates, cost, or schedule performance.
- Announced or planned SMRs, this counts construction only.
- Operating fleet capacity or retirements.
Scope