Build a construction project schedule
A phase-by-phase construction schedule with activities, durations, logic, milestones and look-ahead plan.
This is a practical, copy-paste process for pre-construction planning. Use it when you want a clear structure, then add your own details and the linked evidence.
Published by Deepstory Research. Reviewed Sep 2026.
How to use this method
- 1. Copy or downloadCopy the prompt below, or download the method file and attach it to your chat.
- 2. Paste into any AIChatGPT, Claude, Gemini or Copilot. Replace each [PLACEHOLDER] with your details, or let the AI ask you.
- 3. Add evidenceAttach the evidence files listed on this page so the AI works from sourced numbers, not guesses.
The prompt
Paste it as-is. The AI will ask for anything still in [BRACKETS].
# Build a construction project schedule Method by Deepstory Research: deepstoryresearch.com/method/construction-project-schedule You are a construction planner using Primavera P6 / MS Project conventions. Follow the method below step by step. Goal: A phase-by-phase construction schedule with activities, durations, logic, milestones and look-ahead plan. ## My inputs - Project: [PROJECT] (example: G+4 residential building) - Site and constraints: [SITE_AND_CONSTRAINTS] (example: urban plot, limited laydown) - Contract duration: [CONTRACT_DURATION] (example: 18 months) - Key procurement items: [KEY_PROCUREMENT_ITEMS] (example: lifts, façade) Before you start: if any input above is still in [BRACKETS] or missing, ask me for it in one short numbered list and wait. Do not guess. If I attached files (data, briefs, Deepstory evidence files), treat them as the primary source. ## Steps to follow 1. Define WBS by phase and zone. 2. List activities with durations and logic links. 3. Identify long-lead procurement. 4. Compute critical path and float. 5. Set milestones and a 3-week look-ahead template. ## Deliver the output in this structure - WBS - Activity table - Critical path - Procurement schedule - Milestones - Look-ahead template ## Quality rules - Durations are assumptions unless given; mark them. - Include weather and permit risks. - Label every number as FACT (with source and date), ESTIMATE (show the calculation) or ASSUMPTION. - If a Deepstory evidence file is attached, use its figures as the reference values and cite its source references; tag claims that are not from it as [UNVERIFIED]. - End with: the 3 assumptions that matter most, what would change the answer, and the single best next step.
What you need to give the AI
| Input | Placeholder | Example |
|---|---|---|
| Project | [PROJECT] | G+4 residential building |
| Site and constraints | [SITE_AND_CONSTRAINTS] | urban plot, limited laydown |
| Contract duration | [CONTRACT_DURATION] | 18 months |
| Key procurement items | [KEY_PROCUREMENT_ITEMS] | lifts, façade |
Use it when
- Pre-construction planning.
- Recovering a delayed project.
What you get
- WBS
- Activity table
- Critical path
- Procurement schedule
- Milestones
- Look-ahead template
The procedure, step by step
Read this before you run it, so you can check the AI actually followed the method.
Define WBS by phase and zone.
List activities with durations and logic links.
Identify long-lead procurement.
Compute critical path and float.
Set milestones and a 3-week look-ahead template.
Quality checks built into the prompt
- • Durations are assumptions unless given; mark them.
- • Include weather and permit risks.
- • Every number labelled FACT, ESTIMATE or ASSUMPTION; claims outside attached evidence tagged [UNVERIFIED].
Evidence to use with this method
Methods tell the AI how to think. Evidence gives it sourced numbers to think with. Download a context file and attach it with the prompt.
Nuclear Construction & the SMR Reality Check
Nuclear capacity actually under construction worldwide, and how little of it is small modular reactors.
Run next
Methods that chain well after this one.
Deepstory methods are process guidance for AI tools. Review AI output before relying on it; legal, tax, medical and investment decisions need a qualified professional.