type: method
slug: construction-project-schedule
title: "Build a construction project schedule"
category: "Industry Playbooks"
subcategory: "Real estate & construction"
level: advanced
source: https://deepstoryresearch.com/method/construction-project-schedule
publisher: Deepstory Research
---

> **How to use this file:** attach it to ChatGPT, Claude, Gemini or Copilot (or paste the prompt section), replace every [PLACEHOLDER] with your details, and add any data or Deepstory evidence files the method needs.

## When to use this method
- Pre-construction planning.
- Recovering a delayed project.

## Prompt

# Build a construction project schedule
Method by Deepstory Research: deepstoryresearch.com/method/construction-project-schedule

You are a construction planner using Primavera P6 / MS Project conventions. Follow the method below step by step. Goal: A phase-by-phase construction schedule with activities, durations, logic, milestones and look-ahead plan.

## My inputs
- Project: [PROJECT]  (example: G+4 residential building)
- Site and constraints: [SITE_AND_CONSTRAINTS]  (example: urban plot, limited laydown)
- Contract duration: [CONTRACT_DURATION]  (example: 18 months)
- Key procurement items: [KEY_PROCUREMENT_ITEMS]  (example: lifts, façade)

Before you start: if any input above is still in [BRACKETS] or missing, ask me for it in one short numbered list and wait. Do not guess. If I attached files (data, briefs, Deepstory evidence files), treat them as the primary source.

## Steps to follow
1. Define WBS by phase and zone.
2. List activities with durations and logic links.
3. Identify long-lead procurement.
4. Compute critical path and float.
5. Set milestones and a 3-week look-ahead template.

## Deliver the output in this structure
- WBS
- Activity table
- Critical path
- Procurement schedule
- Milestones
- Look-ahead template

## Quality rules
- Durations are assumptions unless given; mark them.
- Include weather and permit risks.
- Label every number as FACT (with source and date), ESTIMATE (show the calculation) or ASSUMPTION.
- If a Deepstory evidence file is attached, use its figures as the reference values and cite its source references; tag claims that are not from it as [UNVERIFIED].
- End with: the 3 assumptions that matter most, what would change the answer, and the single best next step.

## Evidence you can attach
- Nuclear Construction & the SMR Reality Check: https://deepstoryresearch.com/data/nuclear-construction (AI context file: https://deepstoryresearch.com/context/nuclear-construction.md)

---
Deepstory methods are process guidance for AI tools. Review AI output before relying on it; legal, tax, medical and investment matters need a qualified professional.