Projected impact on electricity prices
Percent increase by scenario and region.
Projected impact on electricity prices
Percent increase by scenario and region.
Projected impact on electricity prices
Rendering the interactive chart…
Expand data table
| Dimension | Series | Value | Value basis | Source |
|---|---|---|---|---|
| Virginia generation cost, by 2030 | Pct | 57 | Actual | Fortune: Data centers could hike power costs in some states over 50% by 2030 |
| US wholesale, decade-end (high) | Pct | 29 | Actual | Fortune: Data centers could hike power costs in some states over 50% by 2030 |
| US wholesale, decade-end (low) | Pct | 6 | Actual | Fortune: Data centers could hike power costs in some states over 50% by 2030 |
Data table
Download CSV| Pct | Label | Series | Source | Value basis |
|---|---|---|---|---|
| 57 | Virginia generation cost, by 2030 | price_impact | Fortune: Data centers could hike power costs in some states over 50% by 2030 | Actual |
| 29 | US wholesale, decade-end (high) | price_impact | Fortune: Data centers could hike power costs in some states over 50% by 2030 | Actual |
| 6 | US wholesale, decade-end (low) | price_impact | Fortune: Data centers could hike power costs in some states over 50% by 2030 | Actual |
How this evidence was built
What it measures
Source-backed values are seeded for all seven charts: global data-center electricity consumption (IEA Energy & AI, historic vs base-case scenario, corroborated by S&P Global), the AI vs non-AI share of data-center power capacity (McKinsey base case, corroborated by jll), the PJM capacity-market clearing price by delivery year (PJM Base Residual Auction reports, corroborated by Utility Dive), the US data-center demand-vs-supply gap to 2028 (Morgan Stanley; Deloitte), per-site power draw vs a city, US data-center power demand (2025 vs 2028), and the projected electricity-price impact by region/scenario.
How it is calculated
- The 2028 available-capacity figure is derived from Morgan Stanley’s ~45 GW shortfall estimate against ~100 GW demand (labeled in the basis label).
- Demand figures trace to crs data-center energy analysis; the Virginia (+57% by 2030) and national wholesale (+6% to +29% by end of decade) price impacts trace to Fortune / public-opinion reporting on data-center power costs.
Key context
- Every numeric point carries a source citation and a basis label.
Key numbers
- Global data centers used ~415 TWh in 2024: ~1.5% of world electricity (iea-electricity).
- AI workloads drew ~44 GW in 2025 of ~103 GW total dc capacity (McKinsey / jll) (mckinsey-aipower).
- PJM capacity-auction clearing prices rose steeply off a $50/MW-day (2022/23) base (pjm-capacity).
- US data-center demand was ~40 GW in 2024 with supply roughly matched, a gap that widens ahead (morgan-stanley).
Caveats
Caveat: the AI-share chart uses McKinsey’s published AI-vs-total capacity trajectory (AI ~44 GW in 2025 → ~156 GW of ~219 GW total by 2030); the 2028 point is interpolated along that trajectory and the non-AI slice is a deduction (total − AI). It is a published-estimate split, not a measured per-year megawatt count.
Caveat: price-impact figures are forward scenarios, not realized prices, and depend on how fast new generation is added. Ranges are shown as separate low/high bars rather than a single point.
Do not use this to
- Exact future dc demand (series mix historicals with analyst estimates).
- Per-utility retail rate impacts (see the power-bills index for state-level).
Scope
June 2026
Sources
Last verified 10 Sept 2026