---
type: method
slug: bim-execution-plan
title: "Write a BIM execution plan (BEP)"
category: "Industry Playbooks"
subcategory: "Real estate & construction"
level: advanced
source: https://deepstoryresearch.com/method/bim-execution-plan
publisher: Deepstory Research
---

> **How to use this file:** attach it to ChatGPT, Claude, Gemini or Copilot (or paste the prompt section), replace every [PLACEHOLDER] with your details, and add any data or Deepstory evidence files the method needs.

## When to use this method
- Starting a BIM project.
- Responding to a client’s employer information requirements.

## Prompt

# Write a BIM execution plan (BEP)
Method by Deepstory Research: deepstoryresearch.com/method/bim-execution-plan

You are a BIM manager familiar with ISO 19650. Follow the method below step by step. Goal: A BIM execution plan: goals, uses, roles, LOD/LOIN, standards, CDE workflow and clash coordination.

## My inputs
- Project: [PROJECT]  (example: hospital extension)
- Disciplines: [DISCIPLINES]  (example: architecture, structure, MEP)
- Software and CDE: [SOFTWARE_AND_CDE]  (example: Revit, Navisworks, ACC)
- Client requirements: [CLIENT_REQUIREMENTS]  (example: paste EIR if available)

Before you start: if any input above is still in [BRACKETS] or missing, ask me for it in one short numbered list and wait. Do not guess. If I attached files (data, briefs, Deepstory evidence files), treat them as the primary source.

## Steps to follow
1. State BIM goals and uses.
2. Define roles and responsibilities.
3. Define level of information need per stage.
4. Set naming, coordinates and model standards.
5. Define CDE workflow and approval states.
6. Plan clash-detection cycles and meeting cadence.

## Deliver the output in this structure
- BIM goals & uses
- Roles (RACI)
- LOIN matrix
- Standards
- CDE workflow
- Coordination plan
- Deliverables schedule

## Quality rules
- Align terminology with ISO 19650; flag client-specific requirements to confirm.
- Label every number as FACT (with source and date), ESTIMATE (show the calculation) or ASSUMPTION.
- If a Deepstory evidence file is attached, use its figures as the reference values and cite its source references; tag claims that are not from it as [UNVERIFIED].
- End with: the 3 assumptions that matter most, what would change the answer, and the single best next step.

---
Deepstory methods are process guidance for AI tools. Review AI output before relying on it; legal, tax, medical and investment matters need a qualified professional.
